Assess the CertsIQ’s updated CTAL-TTA exam questions for free online practice of your ISTQB - Certified Tester Advanced Level - Technical Test Analyst test. Our CTAL TTA dumps questions will enhance your chances of passing the ISTQB Certified Tester Foundation Level certification exam with higher marks.
You are responsible for the performance testing of a new web application. In particular, you are interested in
determining if you have enough and the right type of servers to handle 10,000 concurrent users. Which is the
primary consideration when you are selecting your performance testing tools?
A component has been analysed during a risk-assessment and rated as highly critical. Which of the following
white-box test techniques provides the highest level of coverage and could therefore be used to test this
component?
Consider the pseudo code provided below:
Given the following tests, what additional test(s) (if any) would be needed in order to achieve 100% statement
coverage, with the minimum number of tests?
Test 1: A = 7, B = 7, Expected output: 7
Test 2: A = 7, B = 5, Expected output: 5
You are responsible for planning the non-functional testing for a new product. You will be responsible for the
performance testing and you have determined that you will need a simulator to complete your work, Which of
the following are considerations when purchasing a simulator? 1.Path testing of the tool
2.Time to test the tool
3.cost of hmng specialists
4.Susceptibility to the "probe effect"
5.Method and bme to upgrade and retest the tool as the software changes
6.Control flow analysis
Subject to testing is a software system (COTS) for Project Administration and Control (PACS). PACS is a
multi-project system for controlling the project time, e.g., in terms of scheduling and tracking, and managing
the productivity of projects, e.g., in terms of effort and deliverables.
During various interviews with stakeholders the following information was gathered:
• Using PACS is not business critical. There is no impact such as high financial losses or problems to the
operational continuity of an organization. Its application is not critical since the software package does not
support directly the operational, or the primary, business processes of an organization. It supports (project)
management in the project planning and tracking process. Of course, it will be highly annoying for users if the
system “goes down” from time to time. Although this does not have a high impact for the business process as a
whole, the Mean Time Between Failures (MTBF) still needs to be at a good level to be successful in the
market.
• Users of PACS typically have an academic educational level, but have no prior experience with this
particular type of project management software. The system will be used by a large number of users within an
organization.
• The system will be used on a regular basis, e.g., several times per day by project managers and several times
per week by project employees. This means that the system will not be used very intensively, often only for
some data input or an information request. Its usage is not considered to be very time-critical.
• The data is recorded on-line and real-time. The system is expected to run in multiple hardware environments
in various network environments. It is also expected that changes in the operational environments will happen
in the upcoming period that also need to be supported.
Based on the information provided by the stakeholder, which combination of non-functional quality
characteristics should you propose to test as part of your test approach?
© Copyrights CertsIQ 2025. All Rights Reserved
We use cookies to ensure that we give you the best experience on our website (CertsIQ). If you continue without changing your settings, we'll assume that you are happy to receive all cookies on the CertsIQ.