Higher Test Marks with Free Online HPE7-A03 Exam Practice

Assess the CertsIQ’s updated HPE7-A03 exam questions for free online practice of your Aruba Certified Campus Access Architect test. Our HPE7 A03 dumps questions will enhance your chances of passing the HPE Aruba Certified certification exam with higher marks.

Exam Code: HPE7-A03
Exam Questions: 70
Aruba Certified Campus Access Architect
Updated: 21 Aug, 2025
Question 1

A large multinational financial institution has contracted you to design a new full-stack wired and wireless network for their new 6-story regional office building. The bottom two floors of this facility will be retail space for a large banking branch. The upper floors will be carpeted office space for corporate users, each floor being approximately 100.000 sq ft (9290 sqm). Data centers are all off site and will be out of scope for this project. The customer is underserved by its existing L2-based network infrastructure and would like to take advantage of modern best practices in the new design. The network should be fully resilient and fault-tolerant, with dynamic segmentation at the edge. The retail space will include public guest Wi-Fi access. Retail associates will have corporate tablets for customer service, and there will be a mix of wired and wireless devices throughout the retail floors. The corporate users will primarily use wireless for connectivity, but several wired clients, printers, and hard VoIP phones will be in use. The customer is also planning on renovating the corporate office space in order to take advantage of "smart office' technology. These improvements will drive blue-dot wayfinding. presence analytics, and other location-based services The client decides that they would like for all of their exposed printer, conference room, and VoIP phone connections to be controlled by a stateful firewall What could be planned to ensure that these ports will meet the customer's requirements?

Options :
Answer: A

Question 2

Which alternative source is best suited for site surveys or simul-ations if no floor plans are available? 

Options :
Answer: D

Question 3

You are delivering a replacement collapsed core network proposal to the customer where the core switches will have the switched virtual interlaces (SVl) configured. The customer is not sure that a USX pair of switches will Be able to act as I tie spanning tree root in their environment. Which options are true about spanning tiee and VSX that will help assure the customer that a VSX pair of switches are appropriate for a collapsed core? (Select two.)

Options :
Answer: D,E

Question 4

You ate presenting your network design solution to your customer. What Is important to include in your presentation? 

Options :
Answer: D

Question 5

ACME retail has 38 locations spread out across Ave US states and two provinces in Canada. They are looking to grow 20% over the next two years. They have an HO with a staff of 200 employees. The organization has eight Regional Managers and two VPs who work from home and the road. Stores typically have 17 employees on average per location. The two warehouses have a remote loading system and 20 employees each to load the trucks and fulfill the online orders. The warehouse has 40-foot ceilings and large metal racks to store inventory. The main location is 240K sq ft (22300 st) m) and the Canadian warehouse Is 130K sq ft (12100 sq ml. The forkllfts on the loading docks are equipped with a wireless tablet on board. A typical store Is reportedly about 60.000 sq ft (5575 sqm) and smaller stores are planned at 25.000 sq ft '2320 sq mi. The locations need to expand the abilities to vendors that need to add setup displays or Interactive kiosks in the stores. The current Infrastructure was installed In 2015 and used wireless N technology in a coverage model. The wiring is CatS. and they are unsure of the fiber connections. The inventory is all placed on the floor when it is delivered to the local store. Inventory control is handled through Zebra barcode scanners, and they have had a lot of issues in getting signals throughout the stores and this makes monthly inventory difficult. The organization has a small help desk to troubleshoot issues that happen at the retail locations and PC support for the office. The company is looking to upgrade away from the current pbx system later this year. With the need to grow and cut costs, they are interested in moving the data to the cloud but need to get almost real-time inventory control for the online service to function. The network has all been wired over the last ten years, but with the new systems being all wireless, they have seen the trend to offer wireless to all the vendors for their needs but also would like to allow employees, guests, and contractors all to use it. With the new IT director starting next week, the project has been set by the CTO of the company. The marketing group has asked how they can interact with the customers and get more info, while the IT support desk needs to cut staff in halt. The. office has an MDF and two IDFs located on floors one and two. The HOF is in the basement, and you have multiple WAN circuits for the HO links. Each store has a local handoff from the cable company (ethernet) In the middle of the store in the office, so distance for the wiring is not an issue. The customer has budget concerns but does want something that could last 7+ years. Which two projects does the customer have in the planning state? (Select two

Options :
Answer: A,B

Viewing Page : 1 - 7
Practicing : 1 - 5 of 70 Questions

© Copyrights CertsIQ 2025. All Rights Reserved

We use cookies to ensure that we give you the best experience on our website (CertsIQ). If you continue without changing your settings, we'll assume that you are happy to receive all cookies on the CertsIQ.